O'Kelly-Riddick Stadium Turf Replacement
Project Scope
The artificial turf field in the O'Kelly-Riddick Stadium has reached the end of its useful life due to UV damage and improper drainage as originally installed in 2008. Most artificial turf fields are expected to have a useful life of about 8 years. This project is for a complete replacement of the 83,000-square-foot artificial turf field and the connection of drains to the existing campus stormwater drainage system.
Current Status
Currently, the project is advertising for the advanced planning stages. If interested, the advertising period opens on Friday, March 17, and goes until Monday, April 3. There will be a preproposal conference on Monday, March 27, at 2 p.m.; this is not mandatory.
Location of Preproposal Conference:
Hubbard-Totten Building Room 112
1801 Fayetteville St
Durham, NC 27707
Submit letters of interest and a current SF-330 to the below address:
Joshua M Frey
Hubbard-Totten Building Room 126D
1801 Fayetteville St
Durham, NC 27707